Railway excavator

Adjustable Rail Ballast Planner

Home

Adjustable Rail Ballast Planner

New Products
  • The JG Material Leveling Device Accessories are a dedicated set of components specifically designed for the precise maintenance of railway track beds and subgrades. They strictly adhere to the design specifications and interface standards of JG brand core operation equipment, and can be easily integrated into the mainframe platforms (such as tamping vehicles, maintenance excavators, or specialized leveling equipment) to achieve millimeter-level leveling accuracy and preset slope control for ballast, sub-ballast, and roadbed fill materials. The accessory package includes high-strength alloy wear-resistant scrapers, adjustable angle adjustment frames, intelligent sensing feedback modules, and quick locking mechanisms, ensuring efficient leveling of loose materials between sleepers, rail shoulders, and roadbed surfaces in complex conditions, eliminating local unevenness.
    Read More
NewsletterSubscription

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Home

products

whatsApp

Contact