Custom Solutions For Track Maintance

Jinggong Railway Solves Cross-border Railway Construction Challenges and Accelerates Infrastructure Projects in Multiple Countries
At the construction site of the Yogyakarta - Bandung High-Speed Railway extension in Indonesia, the latest railway-specific excavators delivered by Jinggong are freely switching between muddy roadbeds and standard tracks. This track construction machinery, optimized for tropical conditions, has obtained EU CE certification and has become a key equipment for "Belt and Road Initiative" infrastructure projects.
Global Construction Scenario Pain Point Solution: Precise Maintenance Technology for Rail Gap, which improves efficiency by 300% compared to traditional manual methods; Extreme Cold Version Hydraulic Core Components, with self-balancing oil temperature technology in -35℃ environment, ensuring all-weather construction on the Siberian Railway in winter.
International Customer Testimonial Case: In the railway connection line project of the Padma Bridge in Bangladesh, three Jinggong multi-functional railway excavators completed the leveling of 2.3 kilometers of crushed stone roadbed in a single week by quickly replacing the crushing hammer/hydraulic shears, and were awarded the "Best Construction Machinery Solution" by the owner.