Rail Road Sleeper Changing Machine

Products

Home Railroad Equipment Rail Road Sleeper Changing Machine

JG150ST 15-ton railway sleeper changing machine

JG150ST 15-ton railway sleeper changing machine

The JG150ST 15-Ton Wheeled Excavator revolutionizes railway sleeper replacement with its robust design and exceptional mobility. Engineered for rapid, precise operations in diverse terrains, it features advanced hydraulic systems that minimize downtime and labor costs, while its wheeled configuration ensures easy transport and setup. Ideal for global infrastructure projects, this machine offers enhanced durability, user-friendly controls for safety, and seamless integration with standard attachments, making it a top choice for contractors seeking reliable, high-performance solutions to upgrade rail networks and boost productivity worldwide.

  • Item No :

    JG150ST
  • Order(MOQ) :

    1
  • Payment :

    FOB
  • Product Origin :

    CHINA
  • Color :

    yellow/ orange/ blue(custonizable)
  • Shipping Port :

    xiamen
  • Lead Time :

    30-60 days
  • Weight :

    15000 kg
New Products

Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.

 

 

 

 

 

 

 

 

   

 

Performance parameter

 RANGE OF OPERATION
Boom length 4200mm
Arm length 2000mm
SLEEPER CHANGER ATTACHMENT
Max.opening width of grab  650mm
Min.opening width of grab  200mm
Max. radius grabing weight    0.5~0.6t
Max.width of grab                 3000mm 
 Grapple rotation angle          360°
DIMENSIONS
Machine weight                                              15000kg
(Length*width*height) Transport dimensions   9700*2500*3200mm
Axle base                                                     2750mm
Wheel base (front/rear) 1900mm
 Ground clearance of counterweight                 1290mm
 Min ground clearance                                      310mm
 Back-end radius of gyration 2250mm
TECH PERFORMANCE AND SPECIFICATION
Environmental standards     EURO III 
Engine brand                         Cummins
Rated power                          97KW
 Rated speed                         2200r/min
Angle of rotation                     360°
Hydraulic system working pressure 32Mpa
Hydraulic system flow 270L/min
Variable piston pump 2*63ml/r
Max.haulingforce 76.5KN
Walking speed 25km/h
Grade climbing ability 58%/30°
Fuel tank capacity 240L
Hydraulic oil tank capacity 200L

     

 

 
Q&A
Q: Delivery time and mode of transportation?
A: The standard delivery time is 30 to 60 days, and sea transportation issupported.
 
Q: After-sales service?
A: We have established a global service system covering pre-sale, in-saleand after sale services, and can respond to customer demands within 48hours. Remote technical support and rapid global spare parts supplyensure that equipment malfunctions are resolved promptly.
 
Q: Is there support for machine customization to adapt to the trackstandards of different countries?
A: Yes, parameters can be customized as needed, on-site installationguidance and technical training are provided to meet the diversedemands of the world.

--------------占位---------------

 

 

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Related Products

Crawler-type Railway excavator
JG100LT Railway Sleeper Replacement Machine Track Maintenance Equipment

JG100LT Seigong 10 tons track railway sleeper replacement machine, designed for narrow space and geological fragile section. Construction restrictions on bridge car avoidance holes and steep slopes in mountainous areas; Integrated high-precision hydraulic pillow system, single operation can replace 6-10 sleepers per hour, synchronous completion of ballast backfilling compaction, compared with manual operation efficiency increased by 250%, labor costs reduced by 60%.

Read More
Railway Sleeper Replacement Machine
JG120LT 12ton Railway Sleeper Changing Machine Crawler Excavator

JG120LT Seiko 12 ton crawler railway excavator, designed for efficient replacement of narrow/complex terrain sleeper. Use all-terrain wide track chassis to break through the mud, steep slopes (25°) and tunnel limits; Integrated high-precision hydraulic pillow system, single operation can replace 8-12 sleepers per hour, synchronous completion of ballast leveling. Compatible with crushing hammer, slope dressing device and other accessories, suitable for mountain railway, subway tunnel and station reconstruction, compared with manual operation efficiency increased by 300%, labor cost reduced by 65%.

Read More
Wheeled Railway Sleeper Changing Machine
JG180S 18ton Wheeled Railway Sleeper Changing Machine Railway Excavator

The JG180S Wheeled Railway Sleeper Changing Machine Railway Excavator is a revolutionary piece of equipment designed specifically for the railway construction and maintenance industry. With its advanced technology and robust design, it offers unparalleled efficiency and reliability in sleeper changing operations.

Read More
excavator
JG150LT 15ton Railway Sleeper Changing Machine Crawler Railway Excavator

The JG150LT Railway Sleeper Changing Machine, a cutting - edge crawler railway excavator, is a game - changer in the realm of railway maintenance. Engineered to perfection, it offers a comprehensive solution for efficient and effective sleeper replacement operations.The crawler design of the JG150LT provides it with outstanding mobility on railway tracks. It can smoothly navigate through various terrains, including uneven surfaces and curves. This allows the machine to reach every part of the railway network, ensuring that no sleeper replacement task is out of reach. Whether it's a long - distance mainline or a short - stretch siding, the JG150LT can get the job done.

Read More
Railway Sleeper
JG80S Wheel type Hydraulic Railway Sleeper Replacement Machine

The JG80S 8Ton wheeled hydraulic railway sleeper changer is an efficient heavy-duty machine designed for railway maintenance projects worldwide. Equipped with a powerful hydraulic system, it provides 8 tons of bearing capacity, which can complete the task of sleeper replacement quickly and accurately, significantly improving the efficiency of operation. The innovative wheel structure ensures flexible movement on the track site and reduces manual handling requirements. 

Read More
JG150LT Railway Excavator
JG150LT 150ton tracked railway excavator, railway sleeper replacement machine

The JG150LT 150-ton crawler-type railway excavator has demonstrated remarkable capabilities in the heavy-duty railway infrastructure renewal project. This equipment is specifically designed for the most demanding sleeper replacement projects, and its large crawler chassis can provide impeccable stability and traction even on unstable ballast layers and steep embankments. This powerful machine is equipped with a specially designed sleeper replacement system, which enables it to easily extract and place concrete or wooden sleepers from the operating railway sections.

Read More
Railway digger
JG80LT 8-Ton Crawler-Type Railway Sleeper Replacement Excavator

JG80LT is an 8-ton crawler railway excavator and sleeper changer integrated equipment, specially designed for railway maintenance.   It integrates excavation and sleeper replacement functions, flexible and efficient operation, adapts to the narrow track environment, significantly improves construction safety and efficiency, and reduces maintenance costs.

Read More
Crawler sleeper replacement machine
JG80LT Crawler-Mounted Railway Sleeper Replacement Machine

The JG80LT Crawler-Mounted Railway Sleeper Replacement Machine revolutionizes track maintenance with its integrated hydraulic lifting system. Engineered for rapid sleeper exchange in confined clearance zones, this agile equipment seamlessly replaces deteriorated ties without disrupting adjacent tracks. Its low-profile crawler chassis ensures unmatched stability on ballasted tracks while enabling 360° operational flexibility – slashing track possession time by 50%+ for contractors managing tight maintenance windows.

Read More
NewsletterSubscription

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Home

products

whatsApp

Contact