Railroad Equipment

Products

Home Railroad Equipment

JG80LT 8-Ton Heavy-Duty Crawler Excavator for Efficient Railway Sleeper Replacement

JG80LT 8-Ton Heavy-Duty Crawler Excavator for Efficient Railway Sleeper Replacement

The JG80LT 8-ton heavy crawler excavator is specifically designed for efficient and reliable replacement of railway sleepers, aiming to help international buyers (such as railway operators and construction contractors) significantly enhance maintenance efficiency and reduce operating costs. This excavator combines advanced engineering technology and industrial-grade durability, making it a leader in its category, especially suitable for high-frequency railway maintenance tasks. Its core design concept stems from a deep understanding of market demands - the expansion of global railway networks has led to a surge in the demand for sleeper replacement, and traditional equipment often has low efficiency and is prone to delays. The JG80LT ensures seamless operation in harsh environments (such as mountainous or cold regions) through an optimized hydraulic system and intelligent control module, minimizing downtime and providing up to 30% cost savings for buyers. Based on your independent website goals, I will analyze its value from multiple dimensions: it is not only a piece of equipment, but also a strategic investment that enhances project profitability.

  • Item No :

    JG80LT
  • Order(MOQ) :

    1
  • Payment :

    L/C or T/T
  • Product Origin :

    China
  • Color :

    yellow
  • Shipping Port :

    xiamen
  • Lead Time :

    15-45days
  • Weight :

    8000kg
New Products

Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.

 

Technical Specifications 

Sleeper changer attachment
Max.opening width of grab 650mm
Min.opening width of grab 200mm
Max.radius grabing weight 0.5~0.6t
Max.width of grab 2800mm(customizable)
Grapple rotation angle 360°
Dimensions
(Length*width*height)Transport dimensions 6100*2800*2650mm
Axle base 2600mm
Track gauge 1570mm
Width of crawler 400mm
Ground clearance of counterweight 780mm
Min.ground clearance 280mm
Tech performance and specification
Applicable railway gauge customizable
Working efficiency ≥40pcs/h
Angle of rotation 360°
Machine weight 8000kg
Engine model YUCHAI
Rated power 55.8KW
Rated speed 2200~2300r/min
Note:The product parameters are subject to the actual item.The company reserves the right of interpretation and the final right of interpretation.

 

Product Overview 

JG80LT 8-ton tracked railway sleeper replacement machine

The JG80LT railway sleeper replacement machine is a highly efficient and large-scale track maintenance mechanical equipment, specially designed for railway sleeper replacement operations. It integrates the functions of grasping old sleepers, removing ballast, precisely laying new sleepers and backfilling and tamping.

 

 Product Advantages 

 

Effiient:Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.

Safety:It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.

Precision:Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.

 

Application scenarios

 

Q&A

Q: What are the main functions and advantages?

A: Efficient and automated replacement of railway sleepers, supporting multiple track specifications, and made of durable materials.

Q: Delivery time and mode of transportation?

A: The standard delivery time is 30 to 45 days, and sea transportation is supported.

Q: After-sales service?

A: We have established a global service system covering pre-sale, in-sale and after-sale services, and can respond to customer demands within 48 hours. Remote technical support and rapid global spare parts supply ensure that equipment malfunctions are resolved promptly.

Q: Is there support for machine customization to adapt to the track standards of different countries?

A: Yes, parameters can be customized as needed, on-site installation guidance and technical training are provided to meet the diverse demands of the world.

 

 

 

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Related Products

JG80S8 Railway Excavator
JG80S 8ton wheeled railway excavator railway sleeper replacement excavator

The JG80S 8Ton Wheeled Railway Excipator is a purpose-engineered solution for modern rail maintenance, combining agility with robust performance. Designed specifically for railway sleeper replacement and trackbed excavation, its compact wheeled chassis ensures seamless maneuverability across narrow tracks and confined workspaces. The machine’s hydraulic system is calibrated for precision digging and lifting, enabling operators to tackle sleeper removal, ballast adjustment, and debris clearing with minimal disruption to rail operations. Enhanced with shock-absorbing undercarriage components, it maintains stability on uneven terrain while reducing vibration transfer to delicate rail infrastructure. Ideal for both routine maintenance and emergency repairs, this excavator prioritizes operator comfort through an ergonomic cabin and intuitive controls, ensuring prolonged productivity in demanding environments.

Read More
Crawler-type Railway excavator
JG100LT Railway Sleeper Replacement Machine Track Maintenance Equipment

JG100LT Seigong 10 tons track railway sleeper replacement machine, designed for narrow space and geological fragile section. Construction restrictions on bridge car avoidance holes and steep slopes in mountainous areas; Integrated high-precision hydraulic pillow system, single operation can replace 6-10 sleepers per hour, synchronous completion of ballast backfilling compaction, compared with manual operation efficiency increased by 250%, labor costs reduced by 60%.

Read More
Railway Sleeper Replacement Machine
JG120LT 12ton Railway Sleeper Changing Machine Crawler Excavator

JG120LT Seiko 12 ton crawler railway excavator, designed for efficient replacement of narrow/complex terrain sleeper. Use all-terrain wide track chassis to break through the mud, steep slopes (25°) and tunnel limits; Integrated high-precision hydraulic pillow system, single operation can replace 8-12 sleepers per hour, synchronous completion of ballast leveling. Compatible with crushing hammer, slope dressing device and other accessories, suitable for mountain railway, subway tunnel and station reconstruction, compared with manual operation efficiency increased by 300%, labor cost reduced by 65%.

Read More
Wheeled Railway Sleeper Changing Machine
JG180S 18ton Wheeled Railway Sleeper Changing Machine Railway Excavator

The JG180S Wheeled Railway Sleeper Changing Machine Railway Excavator is a revolutionary piece of equipment designed specifically for the railway construction and maintenance industry. With its advanced technology and robust design, it offers unparalleled efficiency and reliability in sleeper changing operations.

Read More
excavator
JG150LT 15ton Railway Sleeper Changing Machine Crawler Railway Excavator

The JG150LT Railway Sleeper Changing Machine, a cutting - edge crawler railway excavator, is a game - changer in the realm of railway maintenance. Engineered to perfection, it offers a comprehensive solution for efficient and effective sleeper replacement operations.The crawler design of the JG150LT provides it with outstanding mobility on railway tracks. It can smoothly navigate through various terrains, including uneven surfaces and curves. This allows the machine to reach every part of the railway network, ensuring that no sleeper replacement task is out of reach. Whether it's a long - distance mainline or a short - stretch siding, the JG150LT can get the job done.

Read More
Railway Sleeper
JG80S Wheel type Hydraulic Railway Sleeper Replacement Machine

The JG80S 8Ton wheeled hydraulic railway sleeper changer is an efficient heavy-duty machine designed for railway maintenance projects worldwide. Equipped with a powerful hydraulic system, it provides 8 tons of bearing capacity, which can complete the task of sleeper replacement quickly and accurately, significantly improving the efficiency of operation. The innovative wheel structure ensures flexible movement on the track site and reduces manual handling requirements. 

Read More
Railway maintenance equipment
JG100SF Railroad Screen Machine Ballast Cleaning Machine Track Cleaner

JG100SF ballast cleaning screen machine.Professional track cleaning solution! The integrated efficient screening system can quickly remove dirt and gravel impurities from the road bed, and the treatment capacity is up to 300m³/h. The modular design ADAPTS to the global standard gauge, and the automatic operation reduces the labor investment by 70%, which significantly improves the drainage and stability of the line. It is suitable for maintenance of heavy-duty railway, subway and high-speed line. The corrosion-resistant steel structure ensures the service life of more than 10 years.

Read More
Coal leveling machine
JG120S 12Ton Wheel Hirail excavator with material leveler Coal leveling machine

JG120S 12-ton wheeled rail excavator equipped with material leveler is an innovative construction machinery designed for coal leveling. It combines the dual functions of mining and leveling. It uses a 12-ton wheeled chassis to achieve fast switching between road and railway, carrying efficient hydraulic system and intelligent leveling module. It can accurately complete the mining, shaping and surface leveling tasks of coal pile to ensure the uniform distribution of materials and the efficiency of track maintenance. The compact and durable design of the whole machine is suitable for complex working conditions in coal mines, railway freight yards and industrial stations. The operating efficiency is increased by more than 25% compared with traditional equipment, while reducing manual intervention and operating costs. It is an ideal solution for modern material handling and track maintenance.

Read More
NewsletterSubscription

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Home

products

whatsApp

Contact