Custom Solutions For Track Maintance


JG120LT 12-Ton Heavy-Duty Railway Sleeper Replacement Crawler Excavator for Track Maintenance
JG120LT Seiko 12 ton crawler railway excavator, designed for efficient replacement of narrow/complex terrain sleeper. Use all-terrain wide track chassis to break through the mud, steep slopes (25°) and tunnel limits; Integrated high-precision hydraulic pillow system, single operation can replace 8-12 sleepers per hour, synchronous completion of ballast leveling. Compatible with crushing hammer, slope dressing device and other accessories, suitable for mountain railway, subway tunnel and station reconstruction, compared with manual operation efficiency increased by 300%, labor cost reduced by 65%.
Item No :
JG120LTOrder(MOQ) :
1Payment :
L/C or T/TProduct Origin :
ChinaColor :
yellowShipping Port :
xiamenLead Time :
15-45daysWeight :
12000kgHundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
|
Sleeper changer head |
|
|
Max. opening width of grab |
640mm |
|
Max. radius grabbing weight |
0.5-0.6t |
|
Max. width of grab |
2800mm( customizable) |
|
Grapple rotation angle |
360° |
|
Dimensions |
|
|
(Length*width*height)Transport dimensions |
6800*2800*2660mm |
|
Wheel base |
2600mm |
|
Track gauge |
1570mm |
|
Width of crawler |
400mm |
|
Ground clearance of counterweight |
780mm |
|
Min. ground clearance |
360mm |
|
Tech performance and specification |
|
|
Angle of rotation |
360° |
|
Machine weight |
10500kg |
|
Engine model |
WVEICHAI EuroIV /YUCHA! Euroll |
|
Rated power |
81kw/73.5kw |
|
Rated speed |
2000r/min |
|
Note: Product parameters are subject to the actual product, and the right of interpretation and final interpretation belongs to the company. |
|
Product Overview
JG120LT 12ton Railway Sleeper Changing Machine Crawler Excavator
The JG120LT is powered by a high - efficiency engine that provides ample power to handle the toughest sleeper replacement jobs. Its advanced hydraulic system enables smooth and precise operation of the digging, lifting, and placing functions. This allows for quick and accurate removal of old sleepers and installation of new ones, significantly reducing the time required for each replacement.


Product Advantages

Effiient:Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.
Safety:It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.
Precision:Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
Technical Specifications
Application scenarios


Q&A
Q: What are the main functions and advantages?
A: Efficient and automated replacement of railway sleepers, supporting multiple track specifications, and made of durable materials.
Q: Delivery time and mode of transportation?
A: The standard delivery time is 30 to 45 days, and sea transportation is supported.
Q: After-sales service?
A: We have established a global service system covering pre-sale, in-sale and after-sale services, and can respond to customer demands within 48 hours. Remote technical support and rapid global spare parts supply ensure that equipment malfunctions are resolved promptly.
Q: Is there support for machine customization to adapt to the track standards of different countries?
A: Yes, parameters can be customized as needed, on-site installation guidance and technical training are provided to meet the diverse demands of the world.
JG100LT Seigong 10 tons track railway sleeper replacement machine, designed for narrow space and geological fragile section. Construction restrictions on bridge car avoidance holes and steep slopes in mountainous areas; Integrated high-precision hydraulic pillow system, single operation can replace 6-10 sleepers per hour, synchronous completion of ballast backfilling compaction, compared with manual operation efficiency increased by 250%, labor costs reduced by 60%.
Read More
JG120LT Seiko 12 ton crawler railway excavator, designed for efficient replacement of narrow/complex terrain sleeper. Use all-terrain wide track chassis to break through the mud, steep slopes (25°) and tunnel limits; Integrated high-precision hydraulic pillow system, single operation can replace 8-12 sleepers per hour, synchronous completion of ballast leveling. Compatible with crushing hammer, slope dressing device and other accessories, suitable for mountain railway, subway tunnel and station reconstruction, compared with manual operation efficiency increased by 300%, labor cost reduced by 65%.
Read More
The JG180S Wheeled Railway Sleeper Changing Machine Railway Excavator is a revolutionary piece of equipment designed specifically for the railway construction and maintenance industry. With its advanced technology and robust design, it offers unparalleled efficiency and reliability in sleeper changing operations.
Read More
The JG150LT Railway Sleeper Changing Machine, a cutting - edge crawler railway excavator, is a game - changer in the realm of railway maintenance. Engineered to perfection, it offers a comprehensive solution for efficient and effective sleeper replacement operations.The crawler design of the JG150LT provides it with outstanding mobility on railway tracks. It can smoothly navigate through various terrains, including uneven surfaces and curves. This allows the machine to reach every part of the railway network, ensuring that no sleeper replacement task is out of reach. Whether it's a long - distance mainline or a short - stretch siding, the JG150LT can get the job done.
Read More
The JG80S 8Ton wheeled hydraulic railway sleeper changer is an efficient heavy-duty machine designed for railway maintenance projects worldwide. Equipped with a powerful hydraulic system, it provides 8 tons of bearing capacity, which can complete the task of sleeper replacement quickly and accurately, significantly improving the efficiency of operation. The innovative wheel structure ensures flexible movement on the track site and reduces manual handling requirements.
Read More
JG100SF ballast cleaning screen machine.Professional track cleaning solution! The integrated efficient screening system can quickly remove dirt and gravel impurities from the road bed, and the treatment capacity is up to 300m³/h. The modular design ADAPTS to the global standard gauge, and the automatic operation reduces the labor investment by 70%, which significantly improves the drainage and stability of the line. It is suitable for maintenance of heavy-duty railway, subway and high-speed line. The corrosion-resistant steel structure ensures the service life of more than 10 years.
Read More
JG120S 12-ton wheeled rail excavator equipped with material leveler is an innovative construction machinery designed for coal leveling. It combines the dual functions of mining and leveling. It uses a 12-ton wheeled chassis to achieve fast switching between road and railway, carrying efficient hydraulic system and intelligent leveling module. It can accurately complete the mining, shaping and surface leveling tasks of coal pile to ensure the uniform distribution of materials and the efficiency of track maintenance. The compact and durable design of the whole machine is suitable for complex working conditions in coal mines, railway freight yards and industrial stations. The operating efficiency is increased by more than 25% compared with traditional equipment, while reducing manual intervention and operating costs. It is an ideal solution for modern material handling and track maintenance.
Read More
JG80LT 8-Ton Railway Ballast Regulator & Hirail Excavator.Specially designed for efficient track maintenance, integrated ballast finishing and rail overhaul functions. The 8-ton working capacity is adapted to the global standard gauge, and the hydraulic system accurately controls the distribution of ballast to strengthen the stability of the track foundation. Multi-joint manipulator to achieve 360° flexible operation, equipped with replaceable fittings, easy to complete slope shaping, sleepers clear ballast and rail positioning. It conforms to ISO safety certification, ADAPTS to complex working conditions such as high temperature and cold, greatly reduces manual maintenance costs, and improves railway operation and maintenance efficiency by more than 30%.
Read More



