Custom Solutions For Track Maintance

JG150LT 150-Ton Heavy-Duty Tracked Railway Excavator for Sleeper Replacement
The JG150LT 150-ton crawler-type railway excavator has demonstrated remarkable capabilities in the heavy-duty railway infrastructure renewal project. This equipment is specifically designed for the most demanding sleeper replacement projects, and its large crawler chassis can provide impeccable stability and traction even on unstable ballast layers and steep embankments. This powerful machine is equipped with a specially designed sleeper replacement system, which enables it to easily extract and place concrete or wooden sleepers from the operating railway sections.
Item No :
JG150LTOrder(MOQ) :
1Payment :
L/C or T/TProduct Origin :
ChinaColor :
yellowShipping Port :
xiamenLead Time :
15-45daysWeight :
15000kgHundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved. Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
Product Overview
JG150LT 150ton tracked railway excavator, railway sleeper replacement machine
The JG150LT railway sleeper replacement machine combines precision with powerful strength, being a 150-ton specialized equipment that redefines efficiency in the field of track renewal. Its dedicated accessory system coordinates the complex actions of sleeper replacement - from precisely extracting the sleeper without damaging the geometry of the adjacent track, to the precise positioning of the new sleeper to the millimeter level. The low ground pressure tracks can smoothly distribute the huge weight and maintain the contour of the ballast unchanged during critical operations close to the running line.


Product Advantages

Effiient:Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.
Safety:It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.
Precision:Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
Application scenarios


Q&A
Q: What are the main functions and advantages?
A: Efficient and automated replacement of railway sleepers, supporting multiple track specifications, and made of durable materials.
Q: Delivery time and mode of transportation?
A: The standard delivery time is 30 to 45 days, and sea transportation is supported.
Q: After-sales service?
A: We have established a global service system covering pre-sale, in-sale and after-sale services, and can respond to customer demands within 48 hours. Remote technical support and rapid global spare parts supply ensure that equipment malfunctions are resolved promptly.
Q: Is there support for machine customization to adapt to the track standards of different countries?
A: Yes, parameters can be customized as needed, on-site installation guidance and technical training are provided to meet the diverse demands of the world.